We frame new decks with pressure-treated joists set 16 inches on center, hung with galvanized hangers instead of toe-nails. Posts sit on footings sized for the load and for Fullerton's clay soil, not just a quick pour. We'll walk you through decking material options before anything gets ordered.

Deck Repair

Bouncy boards, a cracked stair stringer, a ledger board coming loose from the house, we deal with all of it. We pull back the decking to see what the framing actually looks like before quoting a fix, because the visible problem is rarely the whole story. Sometimes a repair is two joists, sometimes it's the whole substructure.

Deck Staining & Sealing

Sun bleaches wood decking and rain gets into the grain if it's not sealed, so most decks require restaining every 2 to 3 years out here. We pressure wash first, let the wood dry fully, then apply a penetrating stain or sealer depending on the wood species. Skipping the drying step is how you end up with stain that peels in a year.

Custom Deck Design

Multi-level decks, built-in benches, a deck that wraps around a pool or steps down to a sloped yard, we design around what your lot actually does. We'll show you a layout with real dimensions before cutting a single board.

Composite Decking Installation

Composite boards don't rot and don't require restaining, which is why a lot of homeowners switch after their second round of wood repairs. We install with hidden fastener systems so there's no screw heads showing on the surface. The framing underneath still has to be sized right, composite is heavier than wood and sags more between joists if they're spaced too far apart.

Deck Railing Repair

A railing that wiggles is usually a post that's lost its connection to the framing, not just a loose baluster. We rebuild railings to current code, 36 to 42 inches high with gaps no wider than 4 inches between balusters. We can match an existing style or replace the whole railing system.

Deck Resurfacing

If the frame underneath is still solid but the boards are cupped, splintered, or gray, we strip the decking and replace it without rebuilding the structure. It's faster and cheaper than a full rebuild when the framing checks out. We look at joist spacing while the boards are off either way.

Deck Demolition & Removal

Old decks come down fast, old nails and screws don't. We haul away the lumber and run a magnetic sweep of the yard before we leave, so you're not finding hardware in the grass months later.

Multi-Level Deck Construction

Sloped yards around Fullerton often call for a deck that steps down in two or three levels instead of one big flat platform. Each level needs its own ledger and footing plan, and the stairs between them have to meet the same rise-and-run code as any other staircase in the house.

Pergolas & Deck Covers

A pergola or solid cover over part of the deck cuts down on how much sun the boards take, which means less fading and fewer stain jobs over time. We attach to the existing deck framing or set separate posts, depending on what the structure underneath can carry.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Fullerton, CA

We quote deck jobs throughout this part of Orange County.

Fullerton, CA
Anaheim, CA
Santa Ana, CA
Irvine, CA
Huntington Beach, CA
Garden Grove, CA
Orange, CA
Buena Park, CA
Yorba Linda, CA
La Habra, CA
Placentia, CA
Brea, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
In most California cities, a permit is required for any deck more than 30 inches above grade, and many cities require one regardless of height once structural ledger work is involved. A licensed deck contractor pulls the permit and schedules the required inspections as part of the job.
How long does it take to build a deck?
A standard single-level deck of 200 to 400 square feet usually takes 1 to 2 weeks to frame and finish once permits are approved. Multi-level decks, built-in features, or composite decking with hidden fastener systems can push that to 3 to 4 weeks.
Can a deck be built to a specific budget?
Deck projects can be scaled to a budget by adjusting size, decking material, and railing style, since pressure-treated lumber costs significantly less than composite decking per square foot. A contractor can usually offer two or three versions of a design at different price points before anything is ordered.
What kind of guarantee comes with deck work?
Reputable deck contractors offer a workmanship warranty, typically covering framing and installation for one to several years, separate from the manufacturer's warranty on decking material like composite boards. Composite decking brands often carry 25 to 50 year material warranties against fading and staining, separate from labor coverage.
Who do I deal with day to day during the deck build?
On a well-run deck job, one point of contact, usually the lead carpenter or project manager, handles daily updates and any changes to the plan. That's different from a job where a different sub shows up each day and nobody can answer a direct question about progress.
What decking materials are available?
The main options are pressure-treated pine, cedar, composite decking such as Trex or TimberTech, and PVC decking. Pressure-treated wood costs the least upfront but requires restaining every 2 to 3 years, while composite and PVC cost more initially but resist rot and require no staining.
Can I still use my yard while the deck is being built?
Most of the yard outside the immediate work area stays usable during a deck build, though the area right around the footings and framing has to stay clear for safety and equipment access. Noise from saws and nail guns is heaviest during the framing phase, typically the first few days of the job.
How should I prepare the site before deck construction starts?
Clearing furniture, planters, and grills off the existing deck or the build area is the main prep required before a crew arrives. Moving sprinkler heads or irrigation lines that run under the planned footing locations ahead of time also avoids delays once digging starts.
What happens if something unexpected turns up once the old deck comes down?
Rotted ledger boards, termite damage in the house framing, or a footing that was never poured to code are the most common surprises once an old deck is torn out. A contractor should stop, show the homeowner the problem directly, and give a clear price for the additional fix before proceeding, rather than building over it.
How do I maintain a deck after it's built?
Wood decking requires restaining every 2 to 3 years and a yearly check for loose fasteners or soft spots near ground contact. Composite decking mainly requires regular washing to prevent mildew buildup in the grain pattern, with no staining required at all.